12x16 Gable Shed Plans
This is a digital product containing a PDF file about how to build a 12x16 shed with a gable roof. The plans are detailed and come with step by step 3D diagrams, instructions and a Full Cut & Shopping list. The tools needed for the project are also listed in the plans.
You can build this simple shed with these plans in less than one week. Basic tools are needed. The materials required for this project are largely available in almost DIY Store. This shed feature double 8 ft doors to the front of the shed, a side door and a side window. In this manner, you have an easy access inside the shed and plenty of light to work. You can use this diy shed for storage or for doing your favorite hobbies.
You will get:
- Cut Diagrams, Parts Lists
- 3D diagrams with detailed step by step instructions
- Full Cut & Shopping lists
- Tools List
Dimensions for Square Shed: 12' (length) x 16' (width) x 12' (height)
*1 PDF file with full plans! (plans from the blog revised and grouped in 1 PDF file with 1 Cut list, 1 Shopping list)
Measurements are in imperial. The plans are for personal use only. The legal owners won't be liable for any loss, damage or injury arising from the use of information on this plan. It is your responsibility to make adjustments to the plans, to comply with your local building codes.
- Payment is managed by Gumroad and it is safe. Payment is secured by SSL with 128-bit encryption and processed with PCI Compliant service providers. Find out moreĀ here.
- Once payment is completed, you will receive an email from Gumroad (look in spam folder as well). Inside the email you have a VIEW CONTENT button. Press the button, then Download.